Guide for Install

Note: menu and button names in the system may differ slightly from this guide; the guide describes what each function does. Screenshots will be added.

Use this when: you create a project, issue equipment to it and activate the warranty once installation is done.

1. Projects PRJ-

  1. Go to Projects and create a project.
  2. Choose an existing customer, or add a new one (customer type, name, phone, email, address).
  3. Fill in the project name, capacity and installation date.
  4. Save. The system creates code PRJ-.... Initial status: Waiting for equipment.

Project statuses: Waiting for equipment → In progress → Operating → Archived.

Importing customers from CSV: go to Import customers, up to 5,000 rows. Note:

  • A customer CSV import cannot be undone. Check the file before you confirm.
  • A row with a phone number or province that breaks the rules still creates the customer, but leaves that field empty. Fill it in later.
  • The system does not merge duplicate customers on its own; you choose to skip or still add rows that match existing customers.
[DEMO CO. SCREENSHOT – waiting for Session B]: the Projects list with code, customer, capacity and status columns.

2. Issuing stock to a project PX-

Each stock issue holds up to 500 lines.

  1. Go to Equipment stock → Stock issue.
  2. Choose the PRJ- project.
  3. Choose the install crew receiving the equipment.
  4. Scan serials (inverters, batteries) or enter quantities (lot panels, cables, accessories).
  5. Confirm. The system creates issue PX-....

Items in quarantine or in a location under stocktake cannot be issued. Rejected lines are flagged; fix or remove them and confirm again.

[DEMO CO. SCREENSHOT – waiting for Session B]: the Stock issue screen with project and install crew selected, while scanning serials.

3. Install crews

Install crews (crew name, phone number) are created by the Admin. You pick the crew when issuing stock; the crew name appears in reports, so you know which crew received which equipment.

4. Activating warranty for project equipment (5 steps)

Do this after installation is finished. Go to Warranties → Create warranty.

StepOn-screen nameWhat you do
1Select projectChoose a project that already has equipment issued to it
2Select devicesChoose devices by serial; lot items (panels) are registered by quantity in a separate section
3Customer detailsCheck them. They come from the project; to change them, edit the project and come back
4Warranty settingsInstallation date, warranty start date (defaults to the issue date; cannot be later than today), period, and installation warranty
5Confirm and create QRReview the summary and click Activate warranty

Step 4 in detail:

  • Period: leave it blank to use each product's period (set in the Product catalogue). If you enter a different period, you must give a reason.
  • Installation warranty: 24 months by default. It can be turned off.

After activation: each device has a warranty, moves to Installed status, and has a QR code for its label. To print labels, see 04-bao-hanh-cskh.md.

[DEMO CO. SCREENSHOT – waiting for Session B]: the create warranty wizard at step 4 "Warranty settings", with the 1–5 step bar at the top.